CONTRACT DETAILS
Client: Bridgend County Borough Council
Contractor: Tremorfa
Location: Waterton, Bridgend
Duration: November 2017
Tremorfa were appointed by Bridgend County Borough Council to fabricate, provide, install and carry out periodic inspection of the perimeter security gates at Waterton Highways Depot and Biffa Yard.
These gates were designed in house by our physical security specialist, in accordance with DHF Technical Specification TS011:2016. Both sites had sliding gates installed across the entrances. There are automatically lifting arm barriers to be installed inside the sliding gates, with an intercom and fob system for access to the site. These gates were installed one at a time, to ensure access to one site was available while works was carried out on the other minimising disruption to access.